Describe the pumping duty
State slickwater or reuse-water service, target rate, pipe geometry and pressure objective.
Separate each duty because it requires different hydraulic evidence and release measurements.
Describe the water window
Include source, blend, TDS, important ions, pH, temperature and representative variability.
Report normal and difficult ranges rather than one isolated average.
Describe the fluid path
List inversion or wetting, hydration, dilution, injection point, pumps, restrictions and current additives.
Include shear and mixing conditions that can change pressure response.
Define supply needs
Add coded sample needs, trial timing, monthly quantity, packing, destination and document requirements.
Technical sales can then propose a bounded screening and quotation path.

